cExams.net
Test # 89
Enter eMail-id:

1. A control chart is being used to control a manufacturing process. As part of the control a sample of five parts is taken from the manufacturing process each hour of operation. Each of the five parts is measured and the dimension is recorded on the work sheet. The difference between the highest and lowest measured dimension of the five parts is plotted on the control chart. This is called which of the following values?

PMP Certification 89

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

work up (something) or work (something) up
to produce something
I like to work up a sweat when I exercise.
More Idioms ...
  • 101 Ideas to Cope with Stress
  • PMP Preparation
  • MoneyShlok
  • Musical Instruments
  • 101 Tales of Animals
  • Creatinine Clearance Calculator

  • Chourishi Systems